Use this pre-calculated table to quickly estimate how much concrete you need for rectangular slabs, patios, driveways, and sidewalks. Values are calculated using the standard formula: Cubic Yards = Length (ft) × Width (ft) × Depth (in) ÷ 12 ÷ 27. Bag counts assume 80 lb bags covering 0.6 cubic feet each. Add 10% extra for waste and uneven ground.
Slab Sizes at 4-Inch Depth (Standard for Patios & Sidewalks)
| Slab Size (ft) | Cubic Yards | 80 lb Bags | Common Use |
|---|---|---|---|
| 4 × 4 | 0.20 | 9 | Small pad, AC unit base |
| 4 × 6 | 0.30 | 14 | Small walkway section |
| 4 × 8 | 0.40 | 18 | Entry walkway |
| 4 × 10 | 0.49 | 23 | Short sidewalk |
| 6 × 6 | 0.44 | 20 | Trash can pad, small step |
| 6 × 8 | 0.59 | 27 | Garden shed pad |
| 6 × 10 | 0.74 | 34 | Small utility pad |
| 8 × 8 | 0.79 | 36 | Hot tub pad |
| 8 × 10 | 0.99 | 45 | Small patio |
| 8 × 12 | 1.19 | 54 | Shed foundation |
| 10 × 10 | 1.23 | 56 | Standard patio |
| 10 × 12 | 1.48 | 67 | Patio or walkway |
| 10 × 14 | 1.73 | 78 | Medium patio |
| 10 × 16 | 1.98 | 89 | Medium patio |
| 12 × 12 | 1.78 | 80 | Standard patio |
| 12 × 14 | 2.07 | 94 | Patio or carport pad |
| 12 × 16 | 2.37 | 107 | Large patio |
| 12 × 20 | 2.96 | 134 | Single-car driveway section |
| 14 × 14 | 2.42 | 109 | Workshop pad |
| 14 × 16 | 2.77 | 125 | Large patio |
| 16 × 16 | 3.16 | 143 | Large patio, small garage |
| 16 × 20 | 3.95 | 178 | Two-car parking pad |
| 18 × 18 | 4.00 | 180 | Large patio |
| 20 × 20 | 4.94 | 223 | Two-car driveway |
| 20 × 24 | 5.93 | 267 | Large driveway |
| 24 × 24 | 7.11 | 320 | Two-car garage floor |
| 24 × 30 | 8.89 | 400 | Large garage floor |
| 30 × 30 | 11.11 | 500 | Large workshop |
Slab Sizes at 6-Inch Depth (Standard for Driveways & Garages)
| Slab Size (ft) | Cubic Yards | 80 lb Bags | Common Use |
|---|---|---|---|
| 4 × 4 | 0.30 | 14 | Heavy equipment pad |
| 4 × 6 | 0.44 | 20 | Reinforced walkway |
| 4 × 8 | 0.59 | 27 | Entry with vehicle traffic |
| 4 × 10 | 0.74 | 34 | Short driveway section |
| 6 × 6 | 0.67 | 30 | Heavy utility pad |
| 6 × 8 | 0.89 | 40 | Heavy shed foundation |
| 6 × 10 | 1.11 | 50 | Small driveway apron |
| 8 × 8 | 1.19 | 54 | Heavy equipment pad |
| 8 × 10 | 1.48 | 67 | Driveway section |
| 8 × 12 | 1.78 | 80 | Single-car apron |
| 10 × 10 | 1.85 | 84 | Driveway pad |
| 10 × 12 | 2.22 | 100 | Driveway section |
| 10 × 14 | 2.59 | 117 | Driveway extension |
| 10 × 16 | 2.96 | 134 | RV parking pad |
| 12 × 12 | 2.67 | 120 | Single-car driveway |
| 12 × 14 | 3.11 | 140 | Driveway section |
| 12 × 16 | 3.56 | 160 | Single-car garage floor |
| 12 × 20 | 4.44 | 200 | Single-car driveway |
| 14 × 14 | 3.63 | 164 | Workshop floor |
| 14 × 16 | 4.15 | 187 | Large workshop |
| 16 × 16 | 4.74 | 214 | Large single garage |
| 16 × 20 | 5.93 | 267 | Two-car parking |
| 18 × 18 | 6.00 | 270 | Large garage floor |
| 20 × 20 | 7.41 | 334 | Two-car garage floor |
| 20 × 24 | 8.89 | 400 | Oversized two-car garage |
| 24 × 24 | 10.67 | 480 | Three-car garage floor |
| 24 × 30 | 13.33 | 600 | Large shop floor |
| 30 × 30 | 16.67 | 750 | Commercial garage |
Ordering Tips
- Under 1 cubic yard: Buy pre-mixed bags (80 lb bags are the most common). Mix in a wheelbarrow or rent a small mixer.
- 1 to 2 cubic yards: Consider renting a concrete mixer or ordering a short-load delivery from a ready-mix company.
- Over 2 cubic yards: Order a ready-mix truck. It is more cost-effective and ensures a consistent mix.
- Always add 10%: Order 10% more than calculated to account for waste, spillage, and uneven subgrade.
- Bag weight comparison: An 80 lb bag covers 0.6 cu ft. A 60 lb bag covers 0.45 cu ft. Use 60 lb bags if you prefer easier lifting.
Formula Used
All values in this chart are calculated using:
Cubic Yards = (Length in ft × Width in ft × Depth in inches ÷ 12) ÷ 27
80 lb Bags = Cubic Feet ÷ 0.6 (each 80 lb bag yields approximately 0.6 cubic feet of mixed concrete)
Source: Portland Cement Association standards for pre-mixed concrete bag yields.